Like to meet us in person? +31 (0)13 - 529 30 50 or capitalpartners@somerset.nl

Description of the object

725 / 5000
Vertaalresultaten
We are preparing a large-scale data center campus for the new business park “Flevokust”. The plot for this development covers an area of over 10 hectares and is located on the north side of the site, right..

725 / 5000
Vertaalresultaten
We are preparing a large-scale data center campus for the new business park “Flevokust”. The plot for this development covers an area of over 10 hectares and is located on the north side of the site, right opposite the Maxima power plant (ENGIE).

This campus can accommodate hyperscale and colocation data centers.
The construction of the electricity field in a substation will start at the beginning of 2020.

Data Center Campus Flevokust:
MW 150 MW + 150 MW redundancy in an independent substation
 High-voltage power station and ENGIE’s Maxima power station 100 meters away
 Excellent connectivity with very close data lines along the A6
 Optimal cooling system with (fresh) IJsselmeer water

Read more about this object Read less

Specifications

  • Type Data center
  • Status project For rent
  • Plotsize100.000 m2
  • Warehouse60.000 m²
  • Office3.000 m2
  • Mezzanine3.000 m2
More specifications Less specifications

Media overview

Interested in this object?

    Enter your details and we will contact you as soon as possible.